US Bridges

County Road Pp over Wiley Drainage

Fair

Prowers County, Colorado · 0.1 MI W of US 285 · Structure no. PRPP-0.8-36-105

Built
1996
29 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
25 ft
1 main span
Daily traffic
51
2022 count
Owner
County
County Highway Agency

About this bridge

County Road Pp over Wiley Drainage is a steel stringer/multi-beam or girder carrying County Road Pp over Wiley Drainage in Prowers County, Colorado. It was built in 1996, so it is 29 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 51 vehicles a day, projected to reach 61 by 2042. The structure is 25 ft (7.6 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Road Pp
CrossesWiley Drainage
Location0.1 MI W of US 285
RouteCounty Highway 0
Coordinates38.17218, -102.72658
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.2 US tons
Inventory rating30.1 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span22 ft (6.8 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51 (2022)
Projected traffic61 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road Pp over Wiley Drainage built?

It was built in 1996, making it 29 years old in 2025.

What condition is County Road Pp over Wiley Drainage in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does County Road Pp over Wiley Drainage carry?

About 51 vehicles per day (2022 count).

How long is County Road Pp over Wiley Drainage?

The structure is 25 ft (7.6 m) long with a longest span of 22 ft (6.8 m) and a deck 28 ft wide.

Who owns County Road Pp over Wiley Drainage?

It is owned by the County Highway Agency.