County Road 33 over Holly Seep
FairProwers County, Colorado · 0.6 MI N of SH 50 · Structure no. PR33-32-285-64A
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 128
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 33 over Holly Seep is a steel stringer/multi-beam or girder carrying County Road 33 over Holly Seep in Prowers County, Colorado. It was built in 1982, so it is 43 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 128 vehicles a day, projected to reach 152 by 2042. The structure is 41 ft (12.6 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 33 over Holly Seep built?
It was built in 1982, making it 43 years old in 2025.
What condition is County Road 33 over Holly Seep in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does County Road 33 over Holly Seep carry?
About 128 vehicles per day (2022 count).
How long is County Road 33 over Holly Seep?
The structure is 41 ft (12.6 m) long with a longest span of 39 ft (11.8 m) and a deck 28 ft wide.
Who owns County Road 33 over Holly Seep?
It is owned by the County Highway Agency.