CR8/WATSON Divide over Snowmass Creek
FairPosted for loadPitkin County, Colorado · At Snowmass Circle RD · Structure no. PIT-008-00.1A
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 416
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CR8/WATSON Divide over Snowmass Creek is a steel stringer/multi-beam or girder carrying CR8/WATSON Divide over Snowmass Creek in Pitkin County, Colorado. It was built in 1989, so it is 36 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 416 vehicles a day, roughly 2% of them trucks, projected to reach 457 by 2042. The structure is 32 ft (9.8 m) long and 25 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR8/WATSON Divide over Snowmass Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is CR8/WATSON Divide over Snowmass Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does CR8/WATSON Divide over Snowmass Creek carry?
About 416 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is CR8/WATSON Divide over Snowmass Creek?
The structure is 32 ft (9.8 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns CR8/WATSON Divide over Snowmass Creek?
It is owned by the County Highway Agency.