County Road 4/105 over N. Fork-Frying Pan River
FairPitkin County, Colorado · 5 MI E of Reudi Reservoir · Structure no. PIT-004-26.3A
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 121
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 4/105 over N. Fork-Frying Pan River is a prestressed concrete box beam or girders - multiple carrying County Road 4/105 over N. Fork-Frying Pan River in Pitkin County, Colorado. It was built in 1996, so it is 29 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 121 vehicles a day, projected to reach 133 by 2042. The structure is 50 ft (15.3 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 4/105 over N. Fork-Frying Pan River built?
It was built in 1996, making it 29 years old in 2025.
What condition is County Road 4/105 over N. Fork-Frying Pan River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does County Road 4/105 over N. Fork-Frying Pan River carry?
About 121 vehicles per day (2022 count).
How long is County Road 4/105 over N. Fork-Frying Pan River?
The structure is 50 ft (15.3 m) long with a longest span of 47 ft (14.3 m) and a deck 32 ft wide.
Who owns County Road 4/105 over N. Fork-Frying Pan River?
It is owned by the County Highway Agency.