SH 82 Ml over Roaring Fork River
GoodPitkin County, Colorado · Near Basalt · Structure no. G-08-T
- Built
- 1987
- 38 years old, rebuilt 1993
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 358 ft
- 3 main spans
- Daily traffic
- 21,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 82 Ml over Roaring Fork River is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 82 Ml over Roaring Fork River in Pitkin County, Colorado. It was built in 1987 and reconstructed in 1993, so it is 38 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21,000 vehicles a day, roughly 4% of them trucks, projected to reach 25,830 by 2040. The structure is 358 ft (109.2 m) long and 94 ft wide. If it were closed, the detour would be 62.1 mi (100 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 82 Ml over Roaring Fork River built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 1993.
What condition is SH 82 Ml over Roaring Fork River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does SH 82 Ml over Roaring Fork River carry?
About 21,000 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is SH 82 Ml over Roaring Fork River?
The structure is 358 ft (109.2 m) long with a longest span of 117 ft (35.6 m) and a deck 94 ft wide.
Who owns SH 82 Ml over Roaring Fork River?
It is owned by the State Highway Agency.