County Road 33 over Horse Creek Supply Canal
FairOtero County, Colorado · 60 Feet N of CR MM.5 · Structure no. OT33-32-34-183
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 11
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 33 over Horse Creek Supply Canal is a steel stringer/multi-beam or girder carrying County Road 33 over Horse Creek Supply Canal in Otero County, Colorado. It was built in 1970, so it is 55 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11 vehicles a day, projected to reach 12 by 2042. The structure is 32 ft (9.8 m) long and 18 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 33 over Horse Creek Supply Canal built?
It was built in 1970, making it 55 years old in 2025.
What condition is County Road 33 over Horse Creek Supply Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County Road 33 over Horse Creek Supply Canal carry?
About 11 vehicles per day (2022 count).
How long is County Road 33 over Horse Creek Supply Canal?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 18 ft wide.
Who owns County Road 33 over Horse Creek Supply Canal?
It is owned by the County Highway Agency.