County Road 3 over Rocky Ford Highline Cana
GoodOtero County, Colorado · .2 MI N of CR Jj · Structure no. OT-3-3-31.2-07A
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 180
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 3 over Rocky Ford Highline Cana is a steel stringer/multi-beam or girder carrying County Road 3 over Rocky Ford Highline Cana in Otero County, Colorado. It was built in 1993, so it is 32 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 180 vehicles a day, roughly 2% of them trucks, projected to reach 203 by 2042. The structure is 42 ft (12.7 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 3 over Rocky Ford Highline Cana built?
It was built in 1993, making it 32 years old in 2025.
What condition is County Road 3 over Rocky Ford Highline Cana in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does County Road 3 over Rocky Ford Highline Cana carry?
About 180 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is County Road 3 over Rocky Ford Highline Cana?
The structure is 42 ft (12.7 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.
Who owns County Road 3 over Rocky Ford Highline Cana?
It is owned by the County Highway Agency.