US Bridges

US 350 Ml over Lone Tree Arroyo

Good

Otero County, Colorado · 9.1 MI NE of Bloom · Structure no. M-21-K

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
52 ft
3 main spans
Daily traffic
510
2021 count
Owner
State
State Highway Agency

About this bridge

US 350 Ml over Lone Tree Arroyo is a concrete culvert carrying US 350 Ml over Lone Tree Arroyo in Otero County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 510 vehicles a day, roughly 18% of them trucks, projected to reach 574 by 2041. The structure is 52 ft (15.8 m) long and 62 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUS 350 Ml
CrossesLone Tree Arroyo
Location9.1 MI NE of Bloom
RouteU.S. Route 350A
Coordinates37.771, -103.82699
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83.9 US tons
Inventory rating64.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length52 ft (15.8 m)
Longest span17 ft (5.1 m)
Deck width62 ft (18.9 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic510 (2021)
Projected traffic574 by 2041
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 350 Ml over Lone Tree Arroyo built?

It was built in 2024, making it 1 years old in 2025.

What condition is US 350 Ml over Lone Tree Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does US 350 Ml over Lone Tree Arroyo carry?

About 510 vehicles per day (2021 count), of which roughly 18% are trucks.

How long is US 350 Ml over Lone Tree Arroyo?

The structure is 52 ft (15.8 m) long with a longest span of 17 ft (5.1 m) and a deck 62 ft wide.

Who owns US 350 Ml over Lone Tree Arroyo?

It is owned by the State Highway Agency.