I 76 Ml Wbnd over County Road 29
GoodMorgan County, Colorado · 1 MI NE of SH 71 Brush · Structure no. C-22-CG
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 131 ft
- 1 main span
- Daily traffic
- 6,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 76 Ml Wbnd over County Road 29 is a prestressed concrete stringer/multi-beam or girder carrying I 76 Ml Wbnd over County Road 29 in Morgan County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,000 vehicles a day, roughly 18% of them trucks, projected to reach 7,740 by 2040. The structure is 131 ft (39.9 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 76 Ml Wbnd over County Road 29 built?
It was built in 2013, making it 12 years old in 2025.
What condition is I 76 Ml Wbnd over County Road 29 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does I 76 Ml Wbnd over County Road 29 carry?
About 6,000 vehicles per day (2020 count), of which roughly 18% are trucks.
How long is I 76 Ml Wbnd over County Road 29?
The structure is 131 ft (39.9 m) long with a longest span of 126 ft (38.4 m) and a deck 41 ft wide.
Who owns I 76 Ml Wbnd over County Road 29?
It is owned by the State Highway Agency.