US Bridges

I 76 Ml Ebnd over Hospital Road

Good

Morgan County, Colorado · Just W. of Brush Exit · Structure no. C-22-CA

Built
2013
12 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
131 ft
1 main span
Daily traffic
8,000
2020 count
Owner
State
State Highway Agency

About this bridge

I 76 Ml Ebnd over Hospital Road is a prestressed concrete stringer/multi-beam or girder carrying I 76 Ml Ebnd over Hospital Road in Morgan County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,000 vehicles a day, roughly 17% of them trucks, projected to reach 10,880 by 2040. The structure is 131 ft (39.9 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 76 Ml Ebnd
CrossesHospital Road
LocationJust W. of Brush Exit
RouteInterstate 76A
Coordinates40.2683, -103.641
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length131 ft (39.9 m)
Longest span126 ft (38.4 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,000 (2020)
Projected traffic10,880 by 2040
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 76 Ml Ebnd over Hospital Road built?

It was built in 2013, making it 12 years old in 2025.

What condition is I 76 Ml Ebnd over Hospital Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I 76 Ml Ebnd over Hospital Road carry?

About 8,000 vehicles per day (2020 count), of which roughly 17% are trucks.

How long is I 76 Ml Ebnd over Hospital Road?

The structure is 131 ft (39.9 m) long with a longest span of 126 ft (38.4 m) and a deck 41 ft wide.

Who owns I 76 Ml Ebnd over Hospital Road?

It is owned by the State Highway Agency.