SH 39 Ml over S. Platte River Overflow

Fair

Morgan County, Colorado · 6.8 MI N of JCT US 34 · Structure no. C-20-AS

Built
1996
29 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
526 ft
5 main spans
Daily traffic
640
2020 count
Owner
State
State Highway Agency

About this bridge

SH 39 Ml over S. Platte River Overflow is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 39 Ml over S. Platte River Overflow in Morgan County, Colorado. It was built in 1996, so it is 29 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 640 vehicles a day, roughly 16% of them trucks, projected to reach 826 by 2040. The structure is 526 ft (160.2 m) long and 36 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSH 39 Ml
CrossesS. Platte River Overflow
Location6.8 MI N of JCT US 34
RouteState Highway 39A
Coordinates40.34452, -104.06064
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating44.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length526 ft (160.2 m)
Longest span103 ft (31.4 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic640 (2020)
Projected traffic826 by 2040
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 39 Ml over S. Platte River Overflow built?

It was built in 1996, making it 29 years old in 2025.

What condition is SH 39 Ml over S. Platte River Overflow in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does SH 39 Ml over S. Platte River Overflow carry?

About 640 vehicles per day (2020 count), of which roughly 16% are trucks.

How long is SH 39 Ml over S. Platte River Overflow?

The structure is 526 ft (160.2 m) long with a longest span of 103 ft (31.4 m) and a deck 36 ft wide.

Who owns SH 39 Ml over S. Platte River Overflow?

It is owned by the State Highway Agency.