County Road 90A over San Miguel River
FairMontrose County, Colorado · Just NW of CR BB36/PINON · Structure no. 085090A07.0014A
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2023
- Type
- Truss - Thru
- Steel
- Length
- 105 ft
- 1 main span
- Daily traffic
- 50
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 90A over San Miguel River is a steel truss - thru carrying County Road 90A over San Miguel River in Montrose County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 59 by 2042. The structure is 105 ft (31.9 m) long and 24 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 90A over San Miguel River built?
It was built in 1984, making it 41 years old in 2025.
What condition is County Road 90A over San Miguel River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does County Road 90A over San Miguel River carry?
About 50 vehicles per day (2022 count).
How long is County Road 90A over San Miguel River?
The structure is 105 ft (31.9 m) long with a longest span of 96 ft (29.4 m) and a deck 24 ft wide.
Who owns County Road 90A over San Miguel River?
It is owned by the County Highway Agency.