County Road 18 over Dove Creek Canal Reach 1
FairMontezuma County, Colorado · Yellow Jacket Colorado · Structure no. 0405-105
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected November 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 22
- 2006 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
County Road 18 over Dove Creek Canal Reach 1 is a prestressed concrete slab carrying County Road 18 over Dove Creek Canal Reach 1 in Montezuma County, Colorado. It was built in 1984, so it is 41 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22 vehicles a day, projected to reach 20 by 2035. The structure is 56 ft (17 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 18 over Dove Creek Canal Reach 1 built?
It was built in 1984, making it 41 years old in 2025.
What condition is County Road 18 over Dove Creek Canal Reach 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County Road 18 over Dove Creek Canal Reach 1 carry?
About 22 vehicles per day (2006 count).
How long is County Road 18 over Dove Creek Canal Reach 1?
The structure is 56 ft (17 m) long with a longest span of 53 ft (16.3 m) and a deck 27 ft wide.
Who owns County Road 18 over Dove Creek Canal Reach 1?
It is owned by the Bureau of Reclamation and maintained by the County Highway Agency.