County Road 70 over Willow Creek
FairMoffat County, Colorado · 3.6 MI SW of CO RD 101 · Structure no. MOF70-03.59
- Built
- 1955
- 70 years old, rebuilt 1990
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 35 ft
- 2 main spans
- Daily traffic
- 14
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 70 over Willow Creek is a steel continuous stringer/multi-beam or girder carrying County Road 70 over Willow Creek in Moffat County, Colorado. It was built in 1955 and reconstructed in 1990, so it is 70 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14 vehicles a day, roughly 33% of them trucks, projected to reach 16 by 2042. The structure is 35 ft (10.7 m) long and 17 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 70 over Willow Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1990.
What condition is County Road 70 over Willow Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does County Road 70 over Willow Creek carry?
About 14 vehicles per day (2023 count), of which roughly 33% are trucks.
How long is County Road 70 over Willow Creek?
The structure is 35 ft (10.7 m) long with a longest span of 16 ft (4.9 m) and a deck 17 ft wide.
Who owns County Road 70 over Willow Creek?
It is owned by the County Highway Agency.