County Road 124 over Slater Creek
FairMoffat County, Colorado · 0.4 MI West of CO RD1 · Structure no. MOF124-00.37
- Built
- 1983
- 42 years old, rebuilt 2012
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 33 ft
- 1 main span
- Daily traffic
- 101
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 124 over Slater Creek is a steel stringer/multi-beam or girder carrying County Road 124 over Slater Creek in Moffat County, Colorado. It was built in 1983 and reconstructed in 2012, so it is 42 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 101 vehicles a day, roughly 36% of them trucks, projected to reach 118 by 2042. The structure is 33 ft (10.2 m) long and 16 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 124 over Slater Creek built?
It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2012.
What condition is County Road 124 over Slater Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does County Road 124 over Slater Creek carry?
About 101 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is County Road 124 over Slater Creek?
The structure is 33 ft (10.2 m) long with a longest span of 27 ft (8.1 m) and a deck 16 ft wide.
Who owns County Road 124 over Slater Creek?
It is owned by the County Highway Agency.