US Bridges

SH 149 Ml over Rio Grande

Good

Mineral County, Colorado · 7.0 MI SE of Creede · Structure no. M-09-B

Built
1958
67 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
177 ft
3 main spans
Daily traffic
1,400
2020 count
Owner
State
State Highway Agency

About this bridge

SH 149 Ml over Rio Grande is a steel continuous stringer/multi-beam or girder carrying SH 149 Ml over Rio Grande in Mineral County, Colorado. It was built in 1958, so it is 67 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,400 vehicles a day, roughly 8% of them trucks, projected to reach 1,596 by 2040. The structure is 177 ft (53.9 m) long and 34 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSH 149 Ml
CrossesRio Grande
Location7.0 MI SE of Creede
RouteState Highway 149A
Coordinates37.77748, -106.83624
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.2 US tons
Inventory rating21.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3 (+2 approach)
Design loadHS 20
Structure length177 ft (53.9 m)
Longest span51 ft (15.5 m)
Deck width34 ft (10.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2020)
Projected traffic1,596 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 149 Ml over Rio Grande built?

It was built in 1958, making it 67 years old in 2025.

What condition is SH 149 Ml over Rio Grande in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SH 149 Ml over Rio Grande carry?

About 1,400 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is SH 149 Ml over Rio Grande?

The structure is 177 ft (53.9 m) long with a longest span of 51 ft (15.5 m) and a deck 34 ft wide.

Who owns SH 149 Ml over Rio Grande?

It is owned by the State Highway Agency.