US Bridges

Riverside Parkway over Local Drainage

Good

Mesa County, Colorado · At Winters Ave · Structure no. GRJ-27.3-C.7

Built
2010
15 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
9,151
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Riverside Parkway over Local Drainage is a concrete culvert carrying Riverside Parkway over Local Drainage in Mesa County, Colorado. It was built in 2010, so it is 15 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,151 vehicles a day, projected to reach 10,706 by 2042. The structure is 33 ft (10 m) long and 140 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRiverside Parkway
CrossesLocal Drainage
LocationAt Winters Ave
RouteCity Street 0
Coordinates39.05842, -108.54655
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106.8 US tons
Inventory rating106.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length33 ft (10 m)
Longest span10 ft (2.9 m)
Deck width140 ft (42.8 m)
Roadway width52 ft (16 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,151 (2022)
Projected traffic10,706 by 2042
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Riverside Parkway over Local Drainage built?

It was built in 2010, making it 15 years old in 2025.

What condition is Riverside Parkway over Local Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Riverside Parkway over Local Drainage carry?

About 9,151 vehicles per day (2022 count).

How long is Riverside Parkway over Local Drainage?

The structure is 33 ft (10 m) long with a longest span of 10 ft (2.9 m) and a deck 140 ft wide.

Who owns Riverside Parkway over Local Drainage?

It is owned by the City or Municipal Highway Agency.