County Road 68 over Harmony No. 1 Canal
GoodLogan County, Colorado · At Junct. of CO RD 95/68 · Structure no. LOG68-95-208A
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected December 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 13
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 68 over Harmony No. 1 Canal is a prestressed concrete tee beam carrying County Road 68 over Harmony No. 1 Canal in Logan County, Colorado. It was built in 2001, so it is 24 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13 vehicles a day, roughly 71% of them trucks, projected to reach 16 by 2042. The structure is 52 ft (15.8 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 68 over Harmony No. 1 Canal built?
It was built in 2001, making it 24 years old in 2025.
What condition is County Road 68 over Harmony No. 1 Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does County Road 68 over Harmony No. 1 Canal carry?
About 13 vehicles per day (2022 count), of which roughly 71% are trucks.
How long is County Road 68 over Harmony No. 1 Canal?
The structure is 52 ft (15.8 m) long with a longest span of 47 ft (14.3 m) and a deck 35 ft wide.
Who owns County Road 68 over Harmony No. 1 Canal?
It is owned by the County Highway Agency.