County Road 60.5 over Harmony No. 1 Canal
FairLogan County, Colorado · 0.4 MI E of CO RD 79 · Structure no. LOG60.5-79.4178
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected December 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 28
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 60.5 over Harmony No. 1 Canal is a prestressed concrete tee beam carrying County Road 60.5 over Harmony No. 1 Canal in Logan County, Colorado. It was built in 1965, so it is 60 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 28 vehicles a day, roughly 72% of them trucks, projected to reach 35 by 2042. The structure is 43 ft (13 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 60.5 over Harmony No. 1 Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is County Road 60.5 over Harmony No. 1 Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does County Road 60.5 over Harmony No. 1 Canal carry?
About 28 vehicles per day (2022 count), of which roughly 72% are trucks.
How long is County Road 60.5 over Harmony No. 1 Canal?
The structure is 43 ft (13 m) long with a longest span of 41 ft (12.4 m) and a deck 24 ft wide.
Who owns County Road 60.5 over Harmony No. 1 Canal?
It is owned by the County Highway Agency.