County Road 39 over Sterling Seep Ditch No 1
FairLogan County, Colorado · 20 Ft N of CO RD 30.5 · Structure no. LOG39-30.5-256
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected January 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 1,820
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 39 over Sterling Seep Ditch No 1 is a prestressed concrete tee beam carrying County Road 39 over Sterling Seep Ditch No 1 in Logan County, Colorado. It was built in 1992, so it is 33 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,820 vehicles a day, roughly 20% of them trucks, projected to reach 2,238 by 2042. The structure is 27 ft (8.1 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 39 over Sterling Seep Ditch No 1 built?
It was built in 1992, making it 33 years old in 2025.
What condition is County Road 39 over Sterling Seep Ditch No 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does County Road 39 over Sterling Seep Ditch No 1 carry?
About 1,820 vehicles per day (2023 count), of which roughly 20% are trucks.
How long is County Road 39 over Sterling Seep Ditch No 1?
The structure is 27 ft (8.1 m) long with a longest span of 24 ft (7.2 m) and a deck 37 ft wide.
Who owns County Road 39 over Sterling Seep Ditch No 1?
It is owned by the County Highway Agency.