County Road 74E over South Lone Pine Creek
FairLarimer County, Colorado · 9.9 MI E of CO RD 68C · Structure no. LR74E-9.9-68C
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 25 ft
- 1 main span
- Daily traffic
- 2,242
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 74E over South Lone Pine Creek is a wood or timber stringer/multi-beam or girder carrying County Road 74E over South Lone Pine Creek in Larimer County, Colorado. It was built in 1967, so it is 58 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 2,242 vehicles a day, roughly 32% of them trucks, projected to reach 2,802 by 2042. The structure is 25 ft (7.7 m) long and 30 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 74E over South Lone Pine Creek built?
It was built in 1967, making it 58 years old in 2025.
What condition is County Road 74E over South Lone Pine Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does County Road 74E over South Lone Pine Creek carry?
About 2,242 vehicles per day (2023 count), of which roughly 32% are trucks.
How long is County Road 74E over South Lone Pine Creek?
The structure is 25 ft (7.7 m) long with a longest span of 22 ft (6.6 m) and a deck 30 ft wide.
Who owns County Road 74E over South Lone Pine Creek?
It is owned by the County Highway Agency.