CR 50 (willox Ln) over Larimer & Weld Canal
FairLarimer County, Colorado · 0.2 MI E of CO RD 17 · Structure no. LR50-0.2-17-A
- Built
- 2016
- 9 years old
- Condition
- Fair
- inspected March 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 6,416
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CR 50 (willox Ln) over Larimer & Weld Canal is a prestressed concrete box beam or girders - multiple carrying CR 50 (willox Ln) over Larimer & Weld Canal in Larimer County, Colorado. It was built in 2016, so it is 9 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,416 vehicles a day, roughly 6% of them trucks, projected to reach 8,020 by 2043. The structure is 57 ft (17.5 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 50 (willox Ln) over Larimer & Weld Canal built?
It was built in 2016, making it 9 years old in 2025.
What condition is CR 50 (willox Ln) over Larimer & Weld Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does CR 50 (willox Ln) over Larimer & Weld Canal carry?
About 6,416 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is CR 50 (willox Ln) over Larimer & Weld Canal?
The structure is 57 ft (17.5 m) long with a longest span of 51 ft (15.5 m) and a deck 63 ft wide.
Who owns CR 50 (willox Ln) over Larimer & Weld Canal?
It is owned by the County Highway Agency.