County Road 31D over Big Thompson River
FairLarimer County, Colorado · 0.1 MI N of CO RD 22H · Structure no. LR31D-0.1-22H
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected April 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 133 ft
- 3 main spans
- Daily traffic
- 248
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 31D over Big Thompson River is a prestressed concrete tee beam carrying County Road 31D over Big Thompson River in Larimer County, Colorado. It was built in 1978, so it is 47 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 248 vehicles a day, roughly 19% of them trucks, projected to reach 311 by 2042. The structure is 133 ft (40.5 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 31D over Big Thompson River built?
It was built in 1978, making it 47 years old in 2025.
What condition is County Road 31D over Big Thompson River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does County Road 31D over Big Thompson River carry?
About 248 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is County Road 31D over Big Thompson River?
The structure is 133 ft (40.5 m) long with a longest span of 42 ft (12.9 m) and a deck 33 ft wide.
Who owns County Road 31D over Big Thompson River?
It is owned by the County Highway Agency.