S Railroad Ave over Flood Plain
GoodLarimer County, Colorado · 0.6 MI N of CR 18 · Structure no. LOV720SRAILRDAV
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 2,443
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Railroad Ave over Flood Plain is a prestressed concrete stringer/multi-beam or girder carrying S Railroad Ave over Flood Plain in Larimer County, Colorado. It was built in 2019, so it is 6 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,443 vehicles a day, roughly 7% of them trucks, projected to reach 3,054 by 2042. The structure is 103 ft (31.4 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Railroad Ave over Flood Plain built?
It was built in 2019, making it 6 years old in 2025.
What condition is S Railroad Ave over Flood Plain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does S Railroad Ave over Flood Plain carry?
About 2,443 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is S Railroad Ave over Flood Plain?
The structure is 103 ft (31.4 m) long with a longest span of 97 ft (29.6 m) and a deck 50 ft wide.
Who owns S Railroad Ave over Flood Plain?
It is owned by the City or Municipal Highway Agency.