US Bridges

Centerra Parkway over Greeley Loveland Canal

Good

Larimer County, Colorado · 0.1 MI N of US HWY 34 · Structure no. LOV1520CENTERRA

Built
2005
20 years old
Condition
Good
inspected March 2025
Type
Culvert
Concrete
Length
33 ft
2 main spans
Daily traffic
13,787
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Centerra Parkway over Greeley Loveland Canal is a concrete culvert carrying Centerra Parkway over Greeley Loveland Canal in Larimer County, Colorado. It was built in 2005, so it is 20 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,787 vehicles a day, roughly 12% of them trucks, projected to reach 17,234 by 2043. The structure is 33 ft (10.1 m) long and 174 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCenterra Parkway
CrossesGreeley Loveland Canal
Location0.1 MI N of US HWY 34
RouteCity Street 0
Coordinates40.40789, -104.98355
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating87.5 US tons
Inventory rating52.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length33 ft (10.1 m)
Longest span16 ft (4.9 m)
Deck width174 ft (53.1 m)
Roadway width170 ft (51.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,787 (2023)
Projected traffic17,234 by 2043
Trucks12%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Centerra Parkway over Greeley Loveland Canal built?

It was built in 2005, making it 20 years old in 2025.

What condition is Centerra Parkway over Greeley Loveland Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.

How much traffic does Centerra Parkway over Greeley Loveland Canal carry?

About 13,787 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is Centerra Parkway over Greeley Loveland Canal?

The structure is 33 ft (10.1 m) long with a longest span of 16 ft (4.9 m) and a deck 174 ft wide.

Who owns Centerra Parkway over Greeley Loveland Canal?

It is owned by the City or Municipal Highway Agency.