US Bridges

Riverside Drive over Spring Creek

Good

Larimer County, Colorado · 0.2 MI S of Prospect RD · Structure no. FCRVSD-0.2PRST

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
1,455
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Riverside Drive over Spring Creek is a prestressed concrete box beam or girders - multiple carrying Riverside Drive over Spring Creek in Larimer County, Colorado. It was built in 2019, so it is 6 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,455 vehicles a day, roughly 8% of them trucks, projected to reach 1,819 by 2042. The structure is 60 ft (18.3 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRiverside Drive
CrossesSpring Creek
Location0.2 MI S of Prospect RD
RouteCity Street 0
Coordinates40.5647, -105.04458
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.9 US tons
Inventory rating30.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span56 ft (17.1 m)
Deck width60 ft (18.2 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,455 (2023)
Projected traffic1,819 by 2042
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Riverside Drive over Spring Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Riverside Drive over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Riverside Drive over Spring Creek carry?

About 1,455 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Riverside Drive over Spring Creek?

The structure is 60 ft (18.3 m) long with a longest span of 56 ft (17.1 m) and a deck 60 ft wide.

Who owns Riverside Drive over Spring Creek?

It is owned by the City or Municipal Highway Agency.