Mitchell Drive over Larimer Co. Canal No. 2
FairLarimer County, Colorado · 0.1 Mi. S of Horsetooth · Structure no. FCMTCL-0.1-HTH
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected April 2023
- Type
- Frame
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 1,749
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mitchell Drive over Larimer Co. Canal No. 2 is a concrete frame carrying Mitchell Drive over Larimer Co. Canal No. 2 in Larimer County, Colorado. It was built in 1992, so it is 33 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,749 vehicles a day, roughly 6% of them trucks, projected to reach 2,186 by 2043. The structure is 28 ft (8.6 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mitchell Drive over Larimer Co. Canal No. 2 built?
It was built in 1992, making it 33 years old in 2025.
What condition is Mitchell Drive over Larimer Co. Canal No. 2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Mitchell Drive over Larimer Co. Canal No. 2 carry?
About 1,749 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Mitchell Drive over Larimer Co. Canal No. 2?
The structure is 28 ft (8.6 m) long with a longest span of 26 ft (7.9 m) and a deck 50 ft wide.
Who owns Mitchell Drive over Larimer Co. Canal No. 2?
It is owned by the City or Municipal Highway Agency.