South Lemay Avenue over Fossil Creek Tributary
FairLarimer County, Colorado · 0.2 MI N of Trilby Road · Structure no. FCLMY-0.2-TRILB
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected June 2023
- Type
- Culvert
- Concrete
- Length
- 64 ft
- 7 main spans
- Daily traffic
- 12,185
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
South Lemay Avenue over Fossil Creek Tributary is a concrete culvert carrying South Lemay Avenue over Fossil Creek Tributary in Larimer County, Colorado. It was built in 1986, so it is 39 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,185 vehicles a day, roughly 12% of them trucks, projected to reach 15,231 by 2042. The structure is 64 ft (19.4 m) long and 90 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Lemay Avenue over Fossil Creek Tributary built?
It was built in 1986, making it 39 years old in 2025.
What condition is South Lemay Avenue over Fossil Creek Tributary in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does South Lemay Avenue over Fossil Creek Tributary carry?
About 12,185 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is South Lemay Avenue over Fossil Creek Tributary?
The structure is 64 ft (19.4 m) long with a longest span of 12 ft (3.7 m) and a deck 90 ft wide.
Who owns South Lemay Avenue over Fossil Creek Tributary?
It is owned by the City or Municipal Highway Agency.