US Bridges

Crestmore Court over Larimer Co. Canal No. 2

Fair

Larimer County, Colorado · 0.1 MI E of Bryan Avenue · Structure no. FCCRST-0.1-BRYN

Built
1955
70 years old, rebuilt 1970
Condition
Fair
inspected April 2023
Type
Slab
Concrete
Length
23 ft
1 main span
Daily traffic
506
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Crestmore Court over Larimer Co. Canal No. 2 is a concrete slab carrying Crestmore Court over Larimer Co. Canal No. 2 in Larimer County, Colorado. It was built in 1955 and reconstructed in 1970, so it is 70 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 506 vehicles a day, roughly 3% of them trucks, projected to reach 633 by 2043. The structure is 23 ft (6.9 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCrestmore Court
CrossesLarimer Co. Canal No. 2
Location0.1 MI E of Bryan Avenue
RouteCity Street 0
Coordinates40.57942, -105.10361
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (6.9 m)
Longest span20 ft (6.2 m)
Deck width28 ft (8.4 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic506 (2023)
Projected traffic633 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Crestmore Court over Larimer Co. Canal No. 2 built?

It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1970.

What condition is Crestmore Court over Larimer Co. Canal No. 2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Crestmore Court over Larimer Co. Canal No. 2 carry?

About 506 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Crestmore Court over Larimer Co. Canal No. 2?

The structure is 23 ft (6.9 m) long with a longest span of 20 ft (6.2 m) and a deck 28 ft wide.

Who owns Crestmore Court over Larimer Co. Canal No. 2?

It is owned by the City or Municipal Highway Agency.