US Bridges

I25 East Frontage over Hillsboro Tributary

Good

Larimer County, Colorado · 0.5 MI S of SH 402 · Structure no. C-17-HE

Built
2023
2 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
96 ft
1 main span
Daily traffic
2,023
2023 count
Owner
State
State Highway Agency

About this bridge

I25 East Frontage over Hillsboro Tributary is a prestressed concrete box beam or girders - multiple carrying I25 East Frontage over Hillsboro Tributary in Larimer County, Colorado. It was built in 2023, so it is 2 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,023 vehicles a day, roughly 10% of them trucks, projected to reach 2,529 by 2043. The structure is 96 ft (29.3 m) long and 39 ft wide.

CarriesI25 East Frontage
CrossesHillsboro Tributary
Location0.5 MI S of SH 402
RouteInterstate 0
Coordinates40.37182, -104.98945
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating0 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length96 ft (29.3 m)
Longest span93 ft (28.3 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,023 (2023)
Projected traffic2,529 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I25 East Frontage over Hillsboro Tributary built?

It was built in 2023, making it 2 years old in 2025.

What condition is I25 East Frontage over Hillsboro Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I25 East Frontage over Hillsboro Tributary carry?

About 2,023 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is I25 East Frontage over Hillsboro Tributary?

The structure is 96 ft (29.3 m) long with a longest span of 93 ft (28.3 m) and a deck 39 ft wide.

Who owns I25 East Frontage over Hillsboro Tributary?

It is owned by the State Highway Agency.