I25 Ml Nbnd over Poudre River Floodplain
GoodLarimer County, Colorado · 0.2 MI So of Kechter RD · Structure no. B-17-EB
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 206 ft
- 3 main spans
- Daily traffic
- 90,000
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I25 Ml Nbnd over Poudre River Floodplain is a prestressed concrete continuous box beam or girders - single or spread carrying I25 Ml Nbnd over Poudre River Floodplain in Larimer County, Colorado. It was built in 2022, so it is 3 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90,000 vehicles a day, projected to reach 122,400 by 2041. The structure is 206 ft (62.8 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I25 Ml Nbnd over Poudre River Floodplain built?
It was built in 2022, making it 3 years old in 2025.
What condition is I25 Ml Nbnd over Poudre River Floodplain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does I25 Ml Nbnd over Poudre River Floodplain carry?
About 90,000 vehicles per day (2021 count).
How long is I25 Ml Nbnd over Poudre River Floodplain?
The structure is 206 ft (62.8 m) long with a longest span of 66 ft (20.1 m) and a deck 67 ft wide.
Who owns I25 Ml Nbnd over Poudre River Floodplain?
It is owned by the State Highway Agency.