I 25 Ml Sbnd over Co.Rd 82 Buckeye Road
FairLarimer County, Colorado · 11.3 MI South of Wyoming · Structure no. A-17-AA
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Concrete
- Length
- 110 ft
- 3 main spans
- Daily traffic
- 12,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Sbnd over Co.Rd 82 Buckeye Road is a concrete tee beam carrying I 25 Ml Sbnd over Co.Rd 82 Buckeye Road in Larimer County, Colorado. It was built in 1963, so it is 62 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,500 vehicles a day, roughly 14% of them trucks, projected to reach 18,750 by 2040. The structure is 110 ft (33.5 m) long and 42 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Sbnd over Co.Rd 82 Buckeye Road built?
It was built in 1963, making it 62 years old in 2025.
What condition is I 25 Ml Sbnd over Co.Rd 82 Buckeye Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does I 25 Ml Sbnd over Co.Rd 82 Buckeye Road carry?
About 12,500 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is I 25 Ml Sbnd over Co.Rd 82 Buckeye Road?
The structure is 110 ft (33.5 m) long with a longest span of 40 ft (12.2 m) and a deck 42 ft wide.
Who owns I 25 Ml Sbnd over Co.Rd 82 Buckeye Road?
It is owned by the State Highway Agency.