US Bridges

No Data Entered over Road

Good

La Plata County, Colorado · No Data Entered · Structure no. 021308000003033

Built
2013
12 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
145 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over Road is a steel stringer/multi-beam or girder carrying No Data Entered over Road in La Plata County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 145 ft (44.2 m) long and 33 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesRoad
LocationNo Data Entered
RouteFederal Lands Road 603.1
Coordinates37.38045, -107.57854
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating25 US tons
Inventory rating19.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length145 ft (44.2 m)
Longest span145 ft (44.2 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over Road built?

It was built in 2013, making it 12 years old in 2025.

What condition is No Data Entered over Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does No Data Entered over Road carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over Road?

The structure is 145 ft (44.2 m) long with a longest span of 145 ft (44.2 m) and a deck 33 ft wide.

Who owns No Data Entered over Road?

It is owned by the U.S. Forest Service.