US Bridges

41st Avenue over Lena Gulch

GoodPosted for load

Jefferson County, Colorado · Just E of Kipling · Structure no. WTRE-02-0.10-07

Built
1981
44 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
44 ft
3 main spans
Daily traffic
411
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

41st Avenue over Lena Gulch is a concrete culvert carrying 41st Avenue over Lena Gulch in Jefferson County, Colorado. It was built in 1981, so it is 44 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 411 vehicles a day, roughly 4% of them trucks, projected to reach 472 by 2041. The structure is 44 ft (13.3 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries41st Avenue
CrossesLena Gulch
LocationJust E of Kipling
RouteCity Street 0
Coordinates39.77344, -105.10917
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.9 US tons
Inventory rating25 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length44 ft (13.3 m)
Longest span16 ft (4.9 m)
Deck width43 ft (13.1 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic411 (2021)
Projected traffic472 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 41st Avenue over Lena Gulch built?

It was built in 1981, making it 44 years old in 2025.

What condition is 41st Avenue over Lena Gulch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 41st Avenue over Lena Gulch carry?

About 411 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is 41st Avenue over Lena Gulch?

The structure is 44 ft (13.3 m) long with a longest span of 16 ft (4.9 m) and a deck 43 ft wide.

Who owns 41st Avenue over Lena Gulch?

It is owned by the City or Municipal Highway Agency.