US Bridges

I 70 Ml over Garrison Street

Fair

Jefferson County, Colorado · In Arvada · Structure no. E-16-GU

Built
1967
58 years old, rebuilt 1979
Condition
Fair
inspected March 2024
Type
Tee Beam
Concrete Continuous
Length
130 ft
3 main spans
Daily traffic
118,000
2020 count
Owner
State
State Highway Agency

About this bridge

I 70 Ml over Garrison Street is a concrete continuous tee beam carrying I 70 Ml over Garrison Street in Jefferson County, Colorado. It was built in 1967 and reconstructed in 1979, so it is 58 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 118,000 vehicles a day, roughly 10% of them trucks, projected to reach 140,420 by 2040. The structure is 130 ft (39.6 m) long and 157 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 70 Ml
CrossesGarrison Street
LocationIn Arvada
RouteInterstate 70A
Coordinates39.78354, -105.10053
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating38.5 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length130 ft (39.6 m)
Longest span67 ft (20.4 m)
Deck width157 ft (47.8 m)
Roadway width153 ft (46.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic118,000 (2020)
Projected traffic140,420 by 2040
Trucks10%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 70 Ml over Garrison Street built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1979.

What condition is I 70 Ml over Garrison Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does I 70 Ml over Garrison Street carry?

About 118,000 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is I 70 Ml over Garrison Street?

The structure is 130 ft (39.6 m) long with a longest span of 67 ft (20.4 m) and a deck 157 ft wide.

Who owns I 70 Ml over Garrison Street?

It is owned by the State Highway Agency.