Grandview Avenue over Wadsworth Bypass
GoodPosted for loadJefferson County, Colorado · 0.1 MI S of Ralston RD · Structure no. ARVA-GW-0.01-01
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 134 ft
- 2 main spans
- Daily traffic
- 1,294
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Grandview Avenue over Wadsworth Bypass is a prestressed concrete continuous stringer/multi-beam or girder carrying Grandview Avenue over Wadsworth Bypass in Jefferson County, Colorado. It was built in 2008, so it is 17 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 1,294 vehicles a day, roughly 4% of them trucks, projected to reach 1,488 by 2041. The structure is 134 ft (40.9 m) long and 77 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grandview Avenue over Wadsworth Bypass built?
It was built in 2008, making it 17 years old in 2025.
What condition is Grandview Avenue over Wadsworth Bypass in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Grandview Avenue over Wadsworth Bypass carry?
About 1,294 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Grandview Avenue over Wadsworth Bypass?
The structure is 134 ft (40.9 m) long with a longest span of 58 ft (17.6 m) and a deck 77 ft wide.
Who owns Grandview Avenue over Wadsworth Bypass?
It is owned by the City or Municipal Highway Agency.