WB 86th Parkway over Croke Canal | Croke Cana
FairJefferson County, Colorado · .1 MI West of Kipling · Structure no. ARVA-86-0.5-02
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 89 ft
- 1 main span
- Daily traffic
- 9,045
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
WB 86th Parkway over Croke Canal | Croke Cana is a prestressed concrete stringer/multi-beam or girder carrying WB 86th Parkway over Croke Canal | Croke Cana in Jefferson County, Colorado. It was built in 2005, so it is 20 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,045 vehicles a day, roughly 2% of them trucks, projected to reach 10,402 by 2041. The structure is 89 ft (27.1 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB 86th Parkway over Croke Canal | Croke Cana built?
It was built in 2005, making it 20 years old in 2025.
What condition is WB 86th Parkway over Croke Canal | Croke Cana in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does WB 86th Parkway over Croke Canal | Croke Cana carry?
About 9,045 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is WB 86th Parkway over Croke Canal | Croke Cana?
The structure is 89 ft (27.1 m) long with a longest span of 81 ft (24.7 m) and a deck 39 ft wide.
Who owns WB 86th Parkway over Croke Canal | Croke Cana?
It is owned by the City or Municipal Highway Agency.