Center Avenue over Drainage
PoorJefferson County, Colorado · W. of Kipling Street · Structure no. 2195006P0000000
- Built
- 1942
- 83 years old
- Condition
- Poor
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 1,100
- 2019 count
- Owner
- Unknown
About this bridge
Center Avenue over Drainage is a steel stringer/multi-beam or girder carrying Center Avenue over Drainage in Jefferson County, Colorado. It was built in 1942, so it is 83 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,100 vehicles a day, projected to reach 1,210 by 2039. The structure is 30 ft (9.1 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center Avenue over Drainage built?
It was built in 1942, making it 83 years old in 2025.
What condition is Center Avenue over Drainage in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2023.
How much traffic does Center Avenue over Drainage carry?
About 1,100 vehicles per day (2019 count).
How long is Center Avenue over Drainage?
The structure is 30 ft (9.1 m) long with a longest span of 26 ft (7.9 m) and a deck 26 ft wide.
Who owns Center Avenue over Drainage?
It is owned by the owner is not reported.