I 25 Ml Nbnd over Huerfano River
FairHuerfano County, Colorado · 9.4 MI N of JCT US 160+SH · Structure no. N-17-BP
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 231 ft
- 2 main spans
- Daily traffic
- 7,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Ml Nbnd over Huerfano River is a steel continuous stringer/multi-beam or girder carrying I 25 Ml Nbnd over Huerfano River in Huerfano County, Colorado. It was built in 1982, so it is 43 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,000 vehicles a day, roughly 15% of them trucks, projected to reach 9,030 by 2040. The structure is 231 ft (70.3 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Ml Nbnd over Huerfano River built?
It was built in 1982, making it 43 years old in 2025.
What condition is I 25 Ml Nbnd over Huerfano River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does I 25 Ml Nbnd over Huerfano River carry?
About 7,000 vehicles per day (2020 count), of which roughly 15% are trucks.
How long is I 25 Ml Nbnd over Huerfano River?
The structure is 231 ft (70.3 m) long with a longest span of 114 ft (34.8 m) and a deck 40 ft wide.
Who owns I 25 Ml Nbnd over Huerfano River?
It is owned by the State Highway Agency.