County Road 5 over Cebolla Creek
FairPosted for loadHinsdale County, Colorado · 15.4 MI NE of Lake City · Structure no. HIN05-13.90
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 32 ft
- 1 main span
- Daily traffic
- 47
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 5 over Cebolla Creek is a wood or timber stringer/multi-beam or girder carrying County Road 5 over Cebolla Creek in Hinsdale County, Colorado. It was built in 1967, so it is 58 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 47 vehicles a day, projected to reach 57 by 2042. The structure is 32 ft (9.8 m) long and 16 ft wide. If it were closed, the detour would be 67.1 mi (108 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 5 over Cebolla Creek built?
It was built in 1967, making it 58 years old in 2025.
What condition is County Road 5 over Cebolla Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does County Road 5 over Cebolla Creek carry?
About 47 vehicles per day (2022 count).
How long is County Road 5 over Cebolla Creek?
The structure is 32 ft (9.8 m) long with a longest span of 29 ft (8.8 m) and a deck 16 ft wide.
Who owns County Road 5 over Cebolla Creek?
It is owned by the County Highway Agency.