US Bridges

SH 149 Ml over Gunnison/Blue Mesa Res.

Fair

Gunnison County, Colorado · At Junction US 50 · Structure no. K-08-C

Built
1964
61 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
518 ft
5 main spans
Daily traffic
860
2020 count
Owner
State
State Highway Agency

About this bridge

SH 149 Ml over Gunnison/Blue Mesa Res. is a steel continuous stringer/multi-beam or girder carrying SH 149 Ml over Gunnison/Blue Mesa Res. in Gunnison County, Colorado. It was built in 1964, so it is 61 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 860 vehicles a day, roughly 8% of them trucks, projected to reach 1,178 by 2040. The structure is 518 ft (158 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSH 149 Ml
CrossesGunnison/Blue Mesa Res.
LocationAt Junction US 50
RouteState Highway 149A
Coordinates38.48743, -107.05912
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.2 US tons
Inventory rating20.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadH 20
Structure length518 ft (158 m)
Longest span110 ft (33.5 m)
Deck width28 ft (8.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic860 (2020)
Projected traffic1,178 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 149 Ml over Gunnison/Blue Mesa Res. built?

It was built in 1964, making it 61 years old in 2025.

What condition is SH 149 Ml over Gunnison/Blue Mesa Res. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SH 149 Ml over Gunnison/Blue Mesa Res. carry?

About 860 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is SH 149 Ml over Gunnison/Blue Mesa Res.?

The structure is 518 ft (158 m) long with a longest span of 110 ft (33.5 m) and a deck 28 ft wide.

Who owns SH 149 Ml over Gunnison/Blue Mesa Res.?

It is owned by the State Highway Agency.