US Bridges

SH 135 Ml over Slate River

Fair

Gunnison County, Colorado · 5.7 MI SE of Crested Butt · Structure no. I-09-Q

Built
1995
30 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
1 main span
Daily traffic
7,200
2020 count
Owner
State
State Highway Agency

About this bridge

SH 135 Ml over Slate River is a prestressed concrete stringer/multi-beam or girder carrying SH 135 Ml over Slate River in Gunnison County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,200 vehicles a day, roughly 4% of them trucks, projected to reach 9,216 by 2040. The structure is 159 ft (48.5 m) long and 43 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesSH 135 Ml
CrossesSlate River
Location5.7 MI SE of Crested Butt
RouteState Highway 135A
Coordinates38.81452, -106.90443
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length159 ft (48.5 m)
Longest span156 ft (47.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,200 (2020)
Projected traffic9,216 by 2040
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 135 Ml over Slate River built?

It was built in 1995, making it 30 years old in 2025.

What condition is SH 135 Ml over Slate River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does SH 135 Ml over Slate River carry?

About 7,200 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is SH 135 Ml over Slate River?

The structure is 159 ft (48.5 m) long with a longest span of 156 ft (47.5 m) and a deck 43 ft wide.

Who owns SH 135 Ml over Slate River?

It is owned by the State Highway Agency.