US Bridges

Wapiti Street over Fraser River

Poor

Grand County, Colorado · North of Safeway · Structure no. FRSRWAPITI

Built
1996
29 years old
Condition
Poor
inspected September 2023
Type
Culvert
Steel
Length
42 ft
3 main spans
Daily traffic
640
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wapiti Street over Fraser River is a steel culvert carrying Wapiti Street over Fraser River in Grand County, Colorado. It was built in 1996, so it is 29 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 640 vehicles a day, roughly 20% of them trucks, projected to reach 756 by 2042. The structure is 42 ft (12.7 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWapiti Street
CrossesFraser River
LocationNorth of Safeway
RouteCity Street 0
Coordinates39.94619, -105.81272
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating34.7 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadHS 20
Structure length42 ft (12.7 m)
Longest span11 ft (3.4 m)
Deck width66 ft (20.1 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic640 (2023)
Projected traffic756 by 2042
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Wapiti Street over Fraser River built?

It was built in 1996, making it 29 years old in 2025.

What condition is Wapiti Street over Fraser River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2023.

How much traffic does Wapiti Street over Fraser River carry?

About 640 vehicles per day (2023 count), of which roughly 20% are trucks.

How long is Wapiti Street over Fraser River?

The structure is 42 ft (12.7 m) long with a longest span of 11 ft (3.4 m) and a deck 66 ft wide.

Who owns Wapiti Street over Fraser River?

It is owned by the City or Municipal Highway Agency.