119 Sr/Cdot Acc RD over N Fk Clear Creek Ar
FairGilpin County, Colorado · 0.1 MI N of JCT US 6 · Structure no. F-15-U
- Built
- 1939
- 86 years old, rebuilt 1986
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 110 ft
- 2 main spans
- Daily traffic
- 1
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
119 Sr/Cdot Acc RD over N Fk Clear Creek Ar is a steel continuous stringer/multi-beam or girder carrying 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar in Gilpin County, Colorado. It was built in 1939 and reconstructed in 1986, so it is 86 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1 vehicles a day, roughly 3% of them trucks, projected to reach 1 by 2044. The structure is 110 ft (33.5 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1986.
What condition is 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar carry?
About 1 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar?
The structure is 110 ft (33.5 m) long with a longest span of 54 ft (16.5 m) and a deck 33 ft wide.
Who owns 119 Sr/Cdot Acc RD over N Fk Clear Creek Ar?
It is owned by the State Highway Agency.