SH 119_MAIN St. S. over North Clear Creek
GoodGilpin County, Colorado · 1.0 MI E of Black Hawk · Structure no. E-15-AM
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 447 ft
- 5 main spans
- Daily traffic
- 14,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 119_MAIN St. S. over North Clear Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 119_MAIN St. S. over North Clear Creek in Gilpin County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,000 vehicles a day, roughly 2% of them trucks, projected to reach 20,019 by 2038. The structure is 447 ft (136.2 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 119_MAIN St. S. over North Clear Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is SH 119_MAIN St. S. over North Clear Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SH 119_MAIN St. S. over North Clear Creek carry?
About 14,000 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is SH 119_MAIN St. S. over North Clear Creek?
The structure is 447 ft (136.2 m) long with a longest span of 87 ft (26.5 m) and a deck 81 ft wide.
Who owns SH 119_MAIN St. S. over North Clear Creek?
It is owned by the State Highway Agency.