Fire Station Drive over N Clear Creek
FairGilpin County, Colorado · 0.1 MI N of Chase ST · Structure no. BLKHWK-FIRESTA
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected April 2023
- Type
- Frame
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 16
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fire Station Drive over N Clear Creek is a concrete frame carrying Fire Station Drive over N Clear Creek in Gilpin County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16 vehicles a day, projected to reach 19 by 2040. The structure is 34 ft (10.4 m) long and 56 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fire Station Drive over N Clear Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is Fire Station Drive over N Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Fire Station Drive over N Clear Creek carry?
About 16 vehicles per day (2020 count).
How long is Fire Station Drive over N Clear Creek?
The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.7 m) and a deck 56 ft wide.
Who owns Fire Station Drive over N Clear Creek?
It is owned by the City or Municipal Highway Agency.