CR324/MAXFIELD RD over West Divide Creek
GoodGarfield County, Colorado · 150 Ft W of CO RD 311 · Structure no. GAR324-02.21A
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 71 ft
- 1 main span
- Daily traffic
- 106
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CR324/MAXFIELD RD over West Divide Creek is a steel stringer/multi-beam or girder carrying CR324/MAXFIELD RD over West Divide Creek in Garfield County, Colorado. It was built in 2014, so it is 11 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 106 vehicles a day, roughly 28% of them trucks, projected to reach 135 by 2042. The structure is 71 ft (21.5 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR324/MAXFIELD RD over West Divide Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is CR324/MAXFIELD RD over West Divide Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does CR324/MAXFIELD RD over West Divide Creek carry?
About 106 vehicles per day (2023 count), of which roughly 28% are trucks.
How long is CR324/MAXFIELD RD over West Divide Creek?
The structure is 71 ft (21.5 m) long with a longest span of 68 ft (20.8 m) and a deck 35 ft wide.
Who owns CR324/MAXFIELD RD over West Divide Creek?
It is owned by the County Highway Agency.