I 70 Ml Ebnd over BLM Access Road
FairGarfield County, Colorado · 0.7 MI E. of Mesa/Garfiel · Structure no. G-04-AM
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 117 ft
- 1 main span
- Daily traffic
- 9,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I 70 Ml Ebnd over BLM Access Road is a prestressed concrete stringer/multi-beam or girder carrying I 70 Ml Ebnd over BLM Access Road in Garfield County, Colorado. It was built in 1982, so it is 43 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,000 vehicles a day, roughly 16% of them trucks, projected to reach 11,610 by 2040. The structure is 117 ft (35.8 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 70 Ml Ebnd over BLM Access Road built?
It was built in 1982, making it 43 years old in 2025.
What condition is I 70 Ml Ebnd over BLM Access Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does I 70 Ml Ebnd over BLM Access Road carry?
About 9,000 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is I 70 Ml Ebnd over BLM Access Road?
The structure is 117 ft (35.8 m) long with a longest span of 115 ft (35.1 m) and a deck 40 ft wide.
Who owns I 70 Ml Ebnd over BLM Access Road?
It is owned by the State Highway Agency.