US 50 Ml Ebnd over Eight Mile Creek
GoodFremont County, Colorado · 1.0 MI E of JCT SH 67 · Structure no. K-16-CD
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 181 ft
- 2 main spans
- Daily traffic
- 7,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 50 Ml Ebnd over Eight Mile Creek is a prestressed concrete stringer/multi-beam or girder carrying US 50 Ml Ebnd over Eight Mile Creek in Fremont County, Colorado. It was built in 1976, so it is 49 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,000 vehicles a day, roughly 6% of them trucks, projected to reach 7,910 by 2040. The structure is 181 ft (55.3 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 50 Ml Ebnd over Eight Mile Creek built?
It was built in 1976, making it 49 years old in 2025.
What condition is US 50 Ml Ebnd over Eight Mile Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does US 50 Ml Ebnd over Eight Mile Creek carry?
About 7,000 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is US 50 Ml Ebnd over Eight Mile Creek?
The structure is 181 ft (55.3 m) long with a longest span of 88 ft (26.8 m) and a deck 44 ft wide.
Who owns US 50 Ml Ebnd over Eight Mile Creek?
It is owned by the State Highway Agency.