US Bridges

US 50 Ml Ebnd over Sand Creek

Fair

Fremont County, Colorado · 4.0 MI W of Canon City · Structure no. K-15-E

Built
1962
63 years old, rebuilt 1994
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel
Length
63 ft
1 main span
Daily traffic
4,150
2020 count
Owner
State
State Highway Agency

About this bridge

US 50 Ml Ebnd over Sand Creek is a steel stringer/multi-beam or girder carrying US 50 Ml Ebnd over Sand Creek in Fremont County, Colorado. It was built in 1962 and reconstructed in 1994, so it is 63 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,150 vehicles a day, roughly 8% of them trucks, projected to reach 4,648 by 2040. The structure is 63 ft (19.2 m) long and 34 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 50 Ml Ebnd
CrossesSand Creek
Location4.0 MI W of Canon City
RouteU.S. Route 50A
Coordinates38.47333, -105.25878
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.3 US tons
Inventory rating20.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length63 ft (19.2 m)
Longest span59 ft (18 m)
Deck width34 ft (10.4 m)
Roadway width33 ft (10 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,150 (2020)
Projected traffic4,648 by 2040
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$104,000
NavigationNo navigation control on waterway

Frequently asked questions

When was US 50 Ml Ebnd over Sand Creek built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1994.

What condition is US 50 Ml Ebnd over Sand Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does US 50 Ml Ebnd over Sand Creek carry?

About 4,150 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is US 50 Ml Ebnd over Sand Creek?

The structure is 63 ft (19.2 m) long with a longest span of 59 ft (18 m) and a deck 34 ft wide.

Who owns US 50 Ml Ebnd over Sand Creek?

It is owned by the State Highway Agency.